3D Parts Catalog ROI: Cost, Implementation Timeline and the Business Case for Your CFO

VNTANA Blogs 3D Parts Catalog ROI: Cost, Implementation Timeline and the Business Case for Your CFO

Last Updated: October 6, 2026

A credible 3D parts catalog ROI calculation starts with your own operation. Cost depends on catalog size, content conversion volume, integration scope and the users or dealer groups involved.

The timeline runs in phases, and a focused first product line can reach production in weeks when the CAD and business data are ready.

This guide covers the cost model, the 3D parts catalog implementation timeline and the inputs for a parts catalog business case your CFO can review.

Key Takeaways (TL;DR)

•

There is no useful universal price for a 3D parts catalog. Scope changes with product volume, CAD condition, integrations, dealer access and revision frequency.

•

A focused 3D parts catalog implementation should begin with two or three real CAD files before expanding to a complete product line.

•

When estimating 3D parts catalog ROI, calculate the cost of wrong part orders from your own return handling, freight, downtime and lost-order data.

•

Service desk calls are another measurable cost. Track calls related to part identification, fitment, availability and supersession.

•

Aftermarket parts ROI also includes revenue that becomes easier to capture through self-service ordering, especially outside staffed support hours.

•

BCG's 2025 industrial services research puts aftermarket service gross margins at roughly 30-50%, against 15-25% for equipment sales.

•

Establish a baseline before launch. Order accuracy, service calls, orders per dealer, self-service share and failed searches make the financial change visible.

Table of Contents

1.

3D Parts Catalog ROI: at a Glance

2.

What Drives the Cost of a 3D Parts Catalog?

3.

3D Parts Catalog Implementation: Phase by Phase

4.

How to Build the Parts Catalog Business Case

5.

What a CFO Will Push Back On

6.

How to Measure 3D Parts Catalog ROI After Launch

7.

Everything You Need to Know About 3D Parts Catalog ROI

8.

Turn Existing CAD Into an Aftermarket Revenue Channel With VNTANA

9.

FAQs About 3D Parts Catalog ROI

3D Parts Catalog ROI: at a Glance

Area

What to assess

Why it matters

Cost

Catalog size, CAD conversion, integrations, user structure and revision volume

Defines the real scope of the project

First rollout

One product family with representative CAD and BOM data

Creates a measurable starting point

3D parts catalog implementation

Scoping, proof of concept, security, production and dealer rollout

Shows where time will actually be spent

Wrong orders

Return labor, freight, downtime and lost sales

Establishes the cost of wrong part orders

Support workload

Part-related calls multiplied by handling time and labor cost

Turns service desk activity into a financial line

Revenue

Orders per dealer and after-hours transactions

Shows whether self-service captures more demand

Margin

Gross profit on incremental aftermarket orders

Makes aftermarket parts ROI more useful than revenue alone

Measurement

Baseline before launch and the same metrics after launch

Gives the CFO comparable evidence

The financial case becomes easier to build once the investment side is clear. Before estimating payback or annual return, you need to understand what will actually determine project scope.

If you are still evaluating the wider category, this guide to the best spare parts catalog software explains the capabilities worth comparing before you build the financial model.

What Drives the Cost of a 3D Parts Catalog?

[IMAGE PLACEHOLDER: Engineer at a desk reviewing CAD drawings and a 3D model on two screens (docx media: image1.jpg)]

There is no universal price that gives a manufacturer a reliable budget before the scope is understood. An OEM with three complex machine families has a different workload from one managing thousands of configurable products across several dealer groups.

The same applies to 3D parts catalog ROI. You need to know what is being converted, connected and maintained before comparing investment against return.

A credible quote therefore starts with the CAD estate and the systems around it. If a vendor gives a fixed enterprise number before reviewing those inputs, part of the scope is still being assumed.

1. Catalog Size and SKU Count

Start with the number of products that need catalog coverage.

SKU count matters, though raw quantity can be misleading. Five large assemblies with thousands of serviceable components may require more work than hundreds of simpler products.

Product families are therefore a better planning unit than SKU count alone. Identify which line should launch first, then map the assemblies, serviceable parts and relevant variants underneath it.

This also makes the parts catalog business case easier to phase. The first investment can target the product family with the clearest commercial problem instead of waiting for the entire catalog to be ready.

Once that first scope is defined, the next cost question is how much work is required to turn the source files into usable catalog content.

2. Content Conversion

Manufacturers often already own the most accurate source content in CAD. The issue is making those files usable in a browser while preserving the component structure needed for parts identification.

The amount of preparation required will affect both cost and implementation time. Heavy assemblies, inconsistent structures or repeated manual preparation can make catalog production expensive long before integrations are considered.

VNTANA works with 40+ CAD and 3D formats and automates preparation through Intelligent Optimization™. The process is easily customizable around each manufacturer's requirements. Astec Industries reduced model preparation from roughly two weeks per model to about 15 minutes.

For manufacturers comparing 2D vs 3D parts catalogs, this conversion workload is part of the financial difference. A 3D catalog becomes more practical to scale when each new assembly does not create another large block of specialist work.

Preparing the content is only part of the job, though. The catalog also needs the business data that tells a dealer what the component is and whether it can be ordered.

3. Integration Scope

A catalog that helps a technician identify a part removes one source of friction. The aftermarket parts ROI becomes stronger when the same workflow connects that part to the systems that hold current product and commercial data.

That may mean a PLM for engineering content, an ERP for part records and availability, an eCommerce system for ordering, a dealer portal for access or SSO for identity management.

Each connection adds scope to the 3D parts catalog implementation. At the same time, each useful connection can remove a manual step that would otherwise remain after launch.

The practical approach is to separate what the first release needs from what can follow later. If the first product line only requires CAD, BOM and ERP data, prove that path first. Wider integrations can follow once the core identification and ordering workflow is stable.

The systems being connected also determine who can use the catalog and what each group should be able to see.

4. User Count and Dealer Tiers

Some manufacturers need one catalog for every user. Others have regional dealers, separate product entitlements, account-specific access or internal service teams with different permissions.

Those requirements matter because the same catalog may need to behave differently depending on who signs in.

A dealer might need access to approved service parts and account-specific commercial data, while an internal service team may need additional technical information. Mapping those groups early helps define the access model before rollout begins.

The parts catalog business case should therefore account for who needs access and how that access is governed. Otherwise, user structure can appear late in the project as an implementation issue that was never included in the original scope.

Access rules are one part of ongoing operation. Product changes create another.

5. Ongoing Revision Volume

A catalog covering products that change several times a year needs a dependable process for revisions, superseded parts and updated source models.

The useful cost question is not only how many people use the catalog. It is how much work each approved product change creates.

If every revision requires someone to manually prepare a new model, check the output and replace assets across several channels, the catalog carries an ongoing operational cost. That cost rises with every product line added.

This is where 3D digital asset management becomes relevant. VNTANA keeps approved 3D content governed upstream and can push changes through connected channels when the source is updated.

For 3D parts catalog ROI, revision workload is often more useful to model than seat count. It shows whether expanding the catalog creates a repeatable process or another manual burden.

Once these cost drivers are understood, the next question becomes more practical: how long does it take to move from the first real files to a production catalog?

3D Parts Catalog Implementation: Phase by Phase

[IMAGE PLACEHOLDER: Person pointing at project planning notes on a wall (docx media: image4.jpg)]

Teams asking how long to implement parts catalog projects often want one number. In practice, the timeline is better understood as a sequence because different phases are controlled by different teams.

A focused 3D parts catalog implementation can move from real CAD files to a production product line in weeks. Larger programs take longer because security reviews, source data and integrations add work around the catalog itself.

The ranges below are useful for planning rather than contractual delivery estimates.

Phase

Typical planning range

What happens

Common cause of delay

NDA and scoping

3-10 business days

Confirm use case, systems, users and representative files

Ownership or CAD access

Proof of concept

1-2 weeks

Run 2-3 real files through the intended workflow

CAD structure or BOM mapping

Security and IT review

1-6+ weeks

Review security, SSO, architecture and deployment requirements

Enterprise procurement processes

First product line

2-6 weeks

Prepare content, map parts data, connect required systems and test

Inconsistent source data

Dealer rollout

1-3 weeks

Release to a selected dealer group, collect usage feedback and correct gaps

Training and access rules

Remaining product lines

Phased

Reuse the proven process across the wider catalog

Data variation between divisions

These phases answer how long to implement parts catalog programs more accurately than one total estimate because they show where time is being spent and what could slow each stage.

Start With Real Files

The proof of concept should use two or three files from your own CAD estate.

Choose examples that expose the conditions the production workflow will face. That might be a large assembly, a machine with many serviceable components or a product known to create identification problems.

Run those files through the intended process with the relevant BOM and service data. The goal is to find out whether the production workflow works with the source material your teams actually maintain.

Doing this early gives engineering and aftermarket teams evidence about the state of the data before the wider 3D parts catalog implementation begins. It also protects the parts catalog business case from assumptions based on clean demonstration files that do not reflect the real catalog.

Once the files have proven the technical workflow, the project usually moves into an area the catalog team cannot control alone: enterprise security and IT approval.

Expect Security to Run on Its Own Clock

Industrial CAD contains intellectual property. That means IT may need to review data handling, user permissions, SSO and deployment architecture before anything reaches production.

This review can run in parallel with parts of the technical work, but it often follows its own internal procurement and security process.

VNTANA is SOC 2 Type II certified. Proprietary geometry and metadata can be stripped automatically before content is published externally. The engine can also run in a Docker container for private-cloud or on-premises requirements.

Addressing these questions during scoping reduces the chance that a finished pilot sits idle while the security review begins from zero.

Security, however, is only one source of schedule variation. The pilot may also reveal issues inside the source data itself.

Treat CAD Readiness as a Project Variable

Different divisions may use different naming conventions or CAD systems. BOM records may also represent service kits and replacement assemblies differently from engineering.

Those differences can affect the path from an engineering component to an orderable service part.

That does not mean every file needs a company-wide cleanup before work can begin. The better approach is to test the relationship between representative CAD, BOM and service records during the first product line.

The pilot shows where interpretation is needed. Some issues may be limited to one product family, while others may point to a wider data-governance problem.

One production line therefore gives you more useful implementation information than months of abstract cleanup planning.

Doosan Bobcat shows the fast end of the range. It put interactive 3D on its eCommerce product pages in weeks, because VNTANA automated the CAD-to-web pipeline and engineers did not need to prepare each model by hand. A parts catalog follows the same pipeline once BOM data is paired with the parts.

So when someone asks how long to implement parts catalog work, the more useful question is how quickly one representative product line can be proven with real data and internal approvals. Once that process works, later product lines follow a known path.

At that point, the project has a defined scope and a plausible timeline. The CFO's next question is what the business gets back for that investment.

How to Build the Parts Catalog Business Case?

A CFO is unlikely to approve a project because interactive 3D looks better than a PDF.

The parts catalog business case needs to connect the catalog to costs already appearing in the business and revenue the existing process struggles to capture.

For most OEMs, four areas deserve attention: wrong orders, service desk workload, self-service revenue and aftermarket gross margin.

The useful starting point is the most visible failure in many parts workflows: an order that has to be corrected after the buyer chose the wrong component.

Calculate the Cost of Wrong Part Orders

Start with the current error rate, then trace what happens after an identification mistake.

The cost of wrong part orders can be calculated as:

Cost per wrong order = internal return labor + outbound freight + return freight + technician downtime cost + lost gross profit from orders that move elsewhere

Do not assign a generic industry figure to those inputs. Pull them from finance, logistics and service.

Internal labor may include time spent identifying the problem, issuing a return authorization, entering a replacement order and reconciling the credit. Freight should include both directions where the OEM absorbs that cost.

Downtime belongs in the calculation where the business carries direct service penalties, extra site visits or another measurable expense. Lost sales should only be added where you have a defensible way to estimate how often the customer sources the replacement elsewhere.

This turns the cost of wrong part orders into something finance can inspect line by line rather than accepting as a general claim.

NIST estimated $119.1 billion in annual losses from preventable maintenance issues across U.S. discrete manufacturing using 2016 data. The figure provides context for the economic impact of downtime and production disruption, but your 3D parts catalog ROI calculation should still use your own operating data.

Wrong orders are only one place where poor parts identification creates cost. In many organizations, the same uncertainty first appears as a phone call.

Turn Service Desk Calls Into a Cost Line

A technician may eventually identify the correct part but still need to contact the parts desk to confirm fitment, replacement relationships or availability.

Those calls create another measurable cost and often reveal which information the catalog is failing to provide.

Pull several weeks of support data and group calls by reason. Part identification, fitment, supersession and routine availability checks are useful categories because they can often be addressed with better product and service information.

Then calculate:

Annual support cost = relevant weekly calls × average handling minutes ÷ 60 × loaded hourly labor cost × 52

This does not assume the parts desk disappears.

Expert support remains important for ambiguous requests and complex service cases. The aftermarket parts ROI comes from moving repeatable questions into self-service so the existing team has more capacity for work that still requires specialist judgment.

That capacity has another consequence. Buyers are no longer limited entirely by the hours when someone is available to answer the request.

Measure Revenue Captured Outside Staffed Hours

A self-service catalog lets dealers continue identifying and ordering parts outside normal support hours.

Track accepted orders placed during those periods, then look at what happens to them the following day.

If an order still needs rekeying, clarification or correction, it is weak evidence of added capacity. If it reaches the ERP accurately without staff intervention, the transaction shows that the business can accept work beyond the parts desk's schedule.

For the parts catalog business case, use gross profit rather than counting all after-hours revenue as financial benefit. Some of those orders would have arrived the next morning anyway.

The stronger case appears when after-hours ordering grows alongside total order volume. That suggests self-service is capturing demand rather than only changing when an existing order arrives.

Once that additional revenue is identified, margin determines how much financial value it actually contributes.

Include the Margin Argument

BCG's 2025 industrial services research puts aftermarket services gross margins around 30-50%, compared with 15-25% for equipment sales.

That difference matters because revenue alone does not tell a CFO how attractive an additional order is.

A recovered aftermarket sale can contribute more gross profit per dollar of revenue than an equivalent amount of equipment sales. That is why aftermarket parts ROI should be calculated with gross profit wherever possible.

The same principle applies when evaluating digital asset management ROI. Content activity on its own does not make the financial case. The useful question is what revenue the content supports and what manual cost it removes.

With wrong-order savings, support workload and incremental gross profit defined, those inputs can now be combined into one model.

Worked Example: Build a Model You Can Replace With Your Numbers

The example below uses assumptions for illustration. Each input should be replaced with your own figures.

Input

Example assumption

Calculation

Parts orders per year

14,400

1,200 × 12

Current wrong-order rate

6%

864 wrong orders

Cost per wrong order

$255

Labor + freight + downtime allowance

Assumed reduction in wrong orders

50%

432 avoided errors

Annual wrong-order savings

$110,160

432 × $255

Relevant service calls per week

300

Baseline call data

Average handling time

8 minutes

Call-center data

Loaded labor cost

$40/hour

Finance input

Assumed call reduction

30%

Pilot assumption

Annual service savings

$24,960

300 × 30% × 8/60 × $40 × 52

After-hours orders per month

80

Portal data

Average order value

$450

ERP data

Share assumed incremental

35%

Conservative assumption

Gross margin

40%

Finance input

Annual incremental gross profit

$60,480

80 × 12 × $450 × 35% × 40%

Modeled annual benefit

$195,600

Savings + incremental gross profit

The example produces $195,600 in modeled annual benefit before the project cost is entered.

Once you have a scoped investment, the CFO can calculate:

Payback period in months = total project investment ÷ annual modeled benefit × 12

3D parts catalog ROI = (annual modeled benefit – annualized project cost) ÷ annualized project cost × 100

The model becomes more useful when it is tested under less favorable assumptions.

Reduce the expected wrong-order improvement from 50% to 25%. Lower the percentage of after-hours orders counted as incremental. Increase the assumed project cost.

If the parts catalog business case still holds under those conditions, the proposal is easier to defend because the return does not depend on an optimistic scenario.

That is also the point where the likely objections become useful. They test whether the financial model accounts for what the business already has, what dealers actually need and what implementation will require internally.

What a CFO Will Push Back On

[IMAGE PLACEHOLDER: Two businessmen discussing at a laptop in a cafe (docx media: image2.jpg)]

Most objections to a 3D parts catalog fall into four areas: existing capability, dealer demand, data readiness and the option to build internally.

Each one should be addressed with operating evidence rather than a generic argument for new technology:

1. "We Already Have a Parts Catalog"

Start by measuring how the current catalog performs.

•

How many searches fail?

•

How many orders need a call before submission?

•

How many returns start with incorrect part identification?

If those numbers are already strong, the financial case for changing the workflow may be limited.

If they are not, the existing catalog becomes the baseline for the parts catalog business case. The decision is then based on whether the proposed workflow can improve those outcomes enough to justify the investment.

That same evidence is useful when the next objection is that dealers have never requested a different catalog.

2. "Our Dealers Are Not Asking for This"

Dealers may never request a 3D interface by name. Their behavior gives more useful evidence.

Repeated identification calls, abandoned searches, wrong orders and requests for fitment confirmation all show where the existing process creates work. That data gives you a better aftermarket parts ROI estimate than asking dealers whether they want "3D."

The investment should respond to a documented purchasing problem rather than stated demand for a particular interface.

Even with clear dealer friction, though, a manufacturer may still hesitate because the source data behind the catalog is imperfect.

3. "Our CAD Data Is Not Ready"

This concern can be legitimate. Messy assemblies, inconsistent naming or weak relationships between CAD and the service BOM can add time to 3D parts catalog implementation.

The important question is how widespread the problem actually is.

Run representative files through the workflow before funding a broad cleanup initiative. That test will show what prevents publication, what prevents accurate part mapping and what can already move through the process without intervention.

VNTANA accepts more than 40 native and exchange formats. Automated preparation can remove much of the manual work involved in getting models ready for browser use. BOM and business-data relationships still need to be validated against the systems that own them.

The pilot therefore separates genuine data blockers from work that can already be automated.

Once the data risk is understood, finance may still ask whether the same capability could be built internally instead.

4. "We Can Build It Internally"

An internal build should be costed like a long-term product rather than a development project. Include engineering time for CAD conversion, browser performance, viewer development, security, BOM mapping, ERP connections, permissions, mobile testing and revision handling.

Then add the cost of maintaining those capabilities. New product lines, browser changes, integrations and security requirements continue after the first release.

Compare that full ownership cost with the purchased 3D parts catalog implementation over 3 to 5 years.

An internal build may still make sense for some manufacturers. The important point is to compare complete ownership costs rather than the first engineering sprint.

If the project passes those objections and moves forward, the original forecast should become the measurement plan. The same assumptions used to win approval should be checked against what happens after launch.

How to Measure 3D Parts Catalog ROI After Launch

[IMAGE PLACEHOLDER: Presenter at a whiteboard showing a growth chart to colleagues (docx media: image3.jpg)]

You cannot prove 3D parts catalog ROI without a pre-launch baseline.

Choose the first product family and record the relevant measures for a defined period before rollout. After launch, compare the same product line and dealer cohort so the before-and-after numbers refer to the same underlying business.

Metric

Calculation

What it tells you

Order accuracy rate

Correct eligible order lines ÷ eligible fulfilled lines

Whether part selection improves

Service desk calls per week

Relevant identification and order-support calls

Whether routine support work changes

Parts orders per dealer

Accepted parts orders ÷ active dealers

Whether participating dealers purchase more

Self-service share

Orders completed without staff intervention ÷ total orders

Whether the desk handles less routine work

Search-no-result rate

Searches with zero results ÷ total searches

Where the catalog still fails to answer demand

After-hours order share

Accepted orders outside staffed hours ÷ total accepted orders

Whether purchasing extends beyond service hours

Keep the definitions consistent before and after launch.

A wrong part caused by a warehouse picking error should not be classified as an identification problem. Test transactions should be removed. Compatibility issues also need enough time to appear after delivery.

For aftermarket parts ROI, combine these operating measures with gross profit. That keeps the measurement aligned with the financial model used in the original business case.

Portal traffic alone tells you that people visited. More accurate orders, fewer staff interventions and higher gross profit with stable headcount tell you whether the investment changed the economics of the parts operation.

Those results also guide the next rollout decision. If one product family shows higher order accuracy, lower support demand and stronger self-service activity, the case for expanding the 3D parts catalog implementation is based on observed performance rather than another forecast.

The table below brings those decisions back into one view.

Everything You Need to Know About 3D Parts Catalog ROI

Question

Practical answer

What determines project cost?

Catalog size, CAD conversion volume, integrations, dealer structure and revision workload

How long does it take to implement parts catalog projects?

A focused product line can reach production in weeks; enterprise security and data readiness can extend the schedule

Where should the first rollout start?

A product family with frequent identification problems and measurable aftermarket demand

What should a proof of concept include?

Two or three representative CAD files plus real BOM and service data

What creates the strongest parts catalog business case?

Avoided wrong-order costs, lower routine support workload and incremental aftermarket gross profit

How should the cost of wrong part orders be calculated?

Return labor, freight, direct downtime cost and attributable lost gross profit

What proves aftermarket parts ROI?

More accurate orders and more gross profit with fewer manual touches

What can slow 3D parts catalog implementation?

Security review, CAD quality, BOM mapping and integration ownership

Should every product launch at once?

No. Prove the workflow on one product family and expand from there

What should be measured first?

The pre-launch baseline for accuracy, calls, dealer orders, self-service and failed searches

Those economics only hold if the catalog can scale without replacing one manual bottleneck with another. That is the operational problem VNTANA is designed to address.

Turn Existing CAD Into an Aftermarket Revenue Channel With VNTANA

VNTANA turns existing CAD and BOM data into an interactive 3D parts catalogue without requiring engineers to prepare every model by hand.

Our patented Intelligent Optimization™ prepares complex CAD for browser delivery and is easily customizable per client based on their unique needs. We also connect with existing PLM, ERP, PIM and eCommerce systems through open APIs, so manufacturers can keep the systems that already own their engineering and commercial data.

That matters beyond the initial launch. The same workflow can support new product lines and revisions as the catalog grows. Proprietary geometry and metadata can also be stripped automatically before content is published externally, and SOC 2 Type II certification gives IT and procurement an audited baseline for the security review.

This makes us a strong fit for discrete manufacturers and industrial OEMs whose 3D parts catalog ROI depends on moving beyond a small pilot without creating another manual content process.

For teams comparing parts catalog software for heavy equipment manufacturers, the practical question is whether the workflow can move from existing CAD to dealer-ready content and remain manageable as products, parts and revisions change.

Book a demo with our sales team to see how VNTANA can turn your existing CAD into an interactive parts catalog and help you build a measurable aftermarket business case.

FAQs About 3D Parts Catalog ROI

How long does it take to implement a 3D parts catalog?

Implementing a 3D parts catalog takes roughly 6 to 20 weeks from scoping to dealer rollout for a first product line, when the phases run in sequence and security review stays within six weeks. Large enterprises with sensitive CAD can add months. Security review and CAD conditions cause most delays. If you are asking how long to implement parts catalog projects across the whole business, estimate the first line separately.

What does a 3D parts catalog cost?

The cost depends on catalog size, content conversion volume, integration scope, dealer structure and ongoing revision requirements. A manufacturer with one product family and limited integrations has a different scope from an OEM connecting thousands of parts across PLM, ERP and dealer systems. Build the parts catalog business case from those inputs before requesting a firm commercial proposal. A universal enterprise price without reviewing the CAD estate would be an estimate based on missing information.

What is the ROI of a 3D parts catalog?

3D parts catalog ROI is the financial return created by reducing avoidable operating costs and capturing additional aftermarket gross profit relative to the project cost. Measure wrong-order costs, service desk workload, orders per dealer and self-service transactions before launch. Then compare the same measures after rollout. Use gross profit rather than revenue alone when calculating aftermarket parts ROI.

Do we need to clean our CAD data first?

You should test your existing CAD before committing to a large cleanup project. VNTANA works with more than 40 CAD and 3D formats and automates much of the preparation needed for browser use. The first proof of concept should reveal whether component structure, naming or BOM relationships require additional work. CAD readiness can affect how long to implement parts catalog programs, so validate it early.

Can we start with one product line?

Starting with one representative product line is often the most useful approach to 3D parts catalog implementation. Choose a family with meaningful aftermarket volume or frequent identification problems. Capture the pre-launch cost of wrong part orders, support workload and dealer ordering behavior. That gives you a contained aftermarket parts ROI test before expanding across the catalog.

Ashley Crowder

Ashley Crowder, an expert in spatial computing and digital worlds, is the Co-Founder and CEO of VNTANA, an enterprise 3D Product Digital Asset Management system trusted by manufacturers like Doosan Bobcat, Astec Industries and Kohler. VNTANA publishes 3D product content across websites, dealer portals and parts catalogues. She has 14 patents on mixed reality technology and is a part of the Khronos Group to create standards in 3D technology. She oversees VNTANA's partnerships with SynergyXR, Accenture Song and others. Ashley regularly shares her insight on the future of immersive technology at prestigious events including SXSW, AWE, TEDx, the World Economic Forum, TechCrunch AR/VR Sessions, LA Games Conference, Retail Innovation Conference, eCommerce Festival, Digital Summit, Montgomery Summit, and more. She graduated from USC with a bachelors and masters in engineering. She uses her engineering background to guide VNTANA's direction and technology development, so manufacturers can turn the CAD they already own into content that sells.

View all posts | Follow VNTANA on LinkedIn and YouTube

add_filter( 'aioseo_schema_disable', 'aioseo_disable_schema_for_parent_and_children' ); function aioseo_disable_schema_for_parent_and_children( $disabled ) { // Only execute this logic on standard WordPress pages if ( is_page() ) { global $post; $parent_page_id = 26489; // 💡 REPLACE WITH YOUR ACTUAL PARENT PAGE ID // Check if we are viewing the parent page itself if ( is_page( $parent_page_id ) ) { return true; } // Check if the current page has the target parent page as an ancestor $ancestors = get_post_ancestors( $post->ID ); if ( in_array( $parent_page_id, $ancestors ) ) { return true; } } return $disabled; }